Swal Gwam to Pasni


Project comprises the laying of Pipeline from the Shadi Kaur Dam to the Pasni Town. This project is proposed to be financed under Omani grant. The length of pipe line is approximately 40 kilometers from source to supply. The project is divided in to two phases. In phase 1, the scope of work includes the design and supervision of 450mm dia pipeline from existing water works up to the city water works, which covers 10 km of the length. In phase 2, the capacity of work includes the design and supervision of 450mm dia pipeline; the length of pipe is around 30 km.