Shaeed Bhuto Bridge
The 31 km long project area is being designed in three phases. Phase1 consists of 12 km long road from Zahir Pir to Chachra Sharif. The bridge area of 11 km located from 12+000 to 23+000 is considered as phase 2. Phase 3 is started from Kot Mithan and linked with N-5.National Highway Authority is the client of this project.
